SINOTO Secures Landmark 10tph Emulsion Bitumen Plant Contract in Indonesia

2025-11-11

SINOTO is thrilled to announce the securing of a major contract on October 9, 2025, for the supply and installation of a state-of-the-art 10-tonnes-per-hour (tph) bitumen emulsion plant in Indonesia. Read the full case study to discover how our cutting-edge technology is setting a new standard for efficient and green infrastructure across Southeast Asia.

The Infrastructure Imperative of Indonesia

As a large archipelagic country in the world, Indonesia is experiencing mounting pressure as well as a demand to have strong interconnected infrastructure. It has been reported that there has been a large-scale increase in road construction, repair and maintenance due to the continued attention of the government towards the development of the economy and the connectivity of the region. This quick growth does not only need speed and efficiency, but also a change to more environmentally friendly and sustainable materials. Many of these applications favour bitumen emulsion of high quality, known as cold mix, as the energy consumption is much lower, carbon footprint is lower and the emulsion performs better in mixed climates.

The problem of local contractors though is to obtain a continuous and high rate of supply of a dependable and adaptable scope of bitumen emulsion grades, an establishment channel hindrance that may decelerate large-scale projects.

Client and The Contract A strategic Partnership

On October 9, 2025, SINOTO took a major step in consolidating a strategic alliance with a major Indonesian construction and infrastructure company by winning a key contract to build a 10 TPH capacity plant of bitumen emulsion.

As a client that is known to work on national highways, and provincial roads, the solution needed to satisfy three important requirements:

  1. High-Capacity Production: 10 tonnes per hour (tph) to serve the high demands of several and simultaneous massive projects.
  2. Product Versatility:The capability to manufacture different grades of cationic and anionic emulsions (CSRS, CMS and CSS) to meet various roads needs, ranging form surface treatment to soil stabilization.
  3. Advanced Automation:A highly automated system that can be operated with ease to allow the reduction of manual mistakes and guarantee high-quality and consistent production with optimal use of local labor.

The Tailored Solution at SINOTO: Efficiency and Sustainability

We proposed High-Capacity Bitumen Emulsion Plant which is our flag ship. It is a very purposeful system designed to deal with the complexities of large scale infrastructural projects in problematic tropical climates such as Indonesia.

Key Features of the 10 TPH Plant:

  1. High-Shear Colloid Mill:At the heart of the plant is our high-shear colloid mill that is engineered by the Germans. This is a key ingredient in making ultra-fine droplets of bitumen, resulting in high stability, life cycle and performance in the end result- an absolute mandate in high-traffic roads in Indonesia.
  2. Complete Automation of the PLC:The whole process including the treatment of water and the dosage of the chemicals as well as the final blending and storage is controlled by a state of the art Programmable Logic Controller (PLC) system. It has an intelligent control with the ability to make accuracy formula changes and single-click operation, which ensures consistency between batches and reduces waste.
  3. Modular and Fast Deployment: The plant design is complete modular which tremendously saves time during installation on-site. In this case of the Indonesian project, the modular approach will make sure that we can fulfill the aggressive operational schedule of the customer and would start the production within a short period.
  4. Energy-Saving Design: Our emulsion plant is significantly energy-saving as compared to the traditional hot mix operations. The design will also include an optimized heating/recirculation of the bitumen and chemical phases, which will also boost its sustainability profile and make it less costly in terms of operation.

Estimated Effect: Driving Indonesia Forward

This 10tph emulsion bitumen plant, to be installed and commissioned, should be a game-changer to the client and the region:

1. Enhanced Project Timelines:

Getting rid of dependence on third-party suppliers, the client will have complete access to the material provision, which is directly converted into the shorter project duration and fewer delays in logistics.

2. Cost Optimization:

The large production of emulsified bitumen in-house will result in cost-saving in the purchase of the materials, transportation, and energy consumption by a large percentage.

3. Commitment to Green Roads:

The extensive adoption of the cold-mix technology will also synchronize the operations of the client with the international best practices of a sustainable road construction to minimize the energy intensity of the infrastructure development in Indonesia.

The achievement of this contract also goes a long way to affirm the status of SINOTO as one of the international leaders and reliable partners in the provision of high-capacity asphalt and bitumen solutions to support the development of major infrastructures in southeast Asia. We are optimistic about a successful commissioning and a long-lasting relationship that would keep on creating better and stronger roads in Indonesia.

case9.1 Emulsion Bitumen Plant delivery in Indonesia                        case9.1 Emulsion Bitumen Plant delivery in Indonesia                       case9.1 Emulsion Bitumen Plant delivery in Indonesia

 

Request a Quote

    Your Name (required)

    Company Name (required)

    Work Email (required)

    WhatsApp/Phone (required)

    Country of Destination (required)

    Specific Requirements

    Whatsapp

    Whatsapp ID: 008619059581045

    E-mail
    WeChat

    WeChat ID: +86371 80955068

    Telephone

    Get A Quote

    Home Tel Mail Inquiry